✅
ALL CHECKS PASSED
0 / 0 checks passed
📌 Canonical S3 (acoustics6 · HYBRID Study B) Values — Manifest
MediaVerse S3 / acoustics6 · HYBRID Study B — 3 production rooms + buffer spine (the former editing suite is removed; its footprint merged into the widened, high-ceiling Video/Podcast room). These are the single source of truth; if any other page disagrees, that page is wrong.
Room
L × W × H (m)
Area (m²)
Volume (m³)
Clear ceiling
NC
RT60 mid (s)
Schroeder (Hz)
VO Live
3.19 × 1.33 × 2.75
4.24
11.66
2.75 m
NC-12
0.217
273
Control Room
2.58 × 2.70 × 2.75
6.97
19.17
2.75 m
NC-18
0.307
253
Video/Podcast
4.79 × 4.13 × 3.40
19.78
67.3
3.40 m (HIGH)
NC-18
S1 0.332 · S2/S3 0.242 · S4 0.262 (HYBRID 4-state)
120–140
Shell (fixed): trapezoid S=737 / N=860 cm, depth 431–448 cm, gross 34.42 m². Columns COL-W & COL-E immovable. Buffer spine retained in the design as the audio↔video isolation break — a NEW BUILD on site (BOQ W-07; the shell is empty, S3-SITE-TRUTH §1). Height chain (Rev2 laser survey): slab 366.4 − 15 float floor − 76 plenum → 275 cm audio clear; Video/Podcast 366.4 − 15 − 11 compact decoupled ceiling = 340 cm clear. Doors: D1 STC50 90×220 (south→video), D3 STC45 80×220 (Control↔VO), D5 STC50 90×220 (Control external, opens out), OW-1 STC50 80×50 observation. D2 (buffer↔Control) and D4 removed — Control is entered only by external D5.
📐 Ground Truth Floor Plan
Generated 100% from MEDIAVERSE.* data — this is the reference all other SVGs must match
Toggle Dimensions
🚪 Door Positions
Door
SSOT X (cm)
SSOT Y (cm)
SVG X (Y-flip)
Orientation
STC
Location
Status
🧱 Partition Positions
Partition
DXF Y South
DXF Y North
SVG Y South
SVG Y North
Thickness
STC
Status
📏 Room Dimensions & Areas
Room
L (m)
W (m)
Area (m²)
L × W (m²)
NC Target
RT60 Target
RT60 Achieved
Status
🪟 Observation Window vs D3 — Overlap Check
Element
X Start (cm)
X End (cm)
Y (cm)
Width (cm)
Status
🧱 Wall STC Ratings
Wall ID
Name
STC
Thickness (cm)
Layers
Status
✅ Comprehensive Verification Checklist